Operation
An operator places the cabbage head on the pick-up plate with the stalk facing down. The turntable transports the cabbage heads to the coring station. The stalk drill, which is located in a protected position and whose drilling depth is automatically adjusted to the size of the cabbage head, drills out the cabbage heads from below. The drilling residues are collected in a container below the drilling point. After the drilling process, the cabbage head is divided and transferred to subsequent transport technology or a post-cleaning belt.